Here are some 'fast facts' on the new hospital building:
 
 Building Area: Approx. 680,000 ft² (464 beds)
 Concrete structure: 36,500 m3 of concrete 1,300,000 ft2 of form work
 Structural steel: 225 metric tonnes
 Hospital Equipment: 16,000 pieces to relocate or purchase
Leadership in Energy & Environmental Design (LEED) Goal:
Certified
 
Site Work
  • Physical changes to the property and land
  • Phased site servicing and temporary parking lots
  • Bulk excavation, lagging, and tie-backs
  • Parking lot preparation
  • Extensive landscaping plans
Structural
  • Piles and caissons for concrete structure
  • Multi-level cast in place concrete structure
  • Structural steel penthouse
Envelope
  • Fabrication and installation of curtainwall
  • Exterior finishes such as stone veneer, aluminum, glazing, curtainwall, wood, stone, cementitious panel soffits
  • Green roof
 Finishes
  • Drywall and masonry partitions throughout, with wall protection in high traffic areas
  • Concourse and ground levels to have terrazzo flooring and cementitious wall paneling in public corridors with wood slat ceilings to be consistent with soffits at ground level
  • Terrazzo flooring in public spaces, linoleum/vinyl/fluid applied flooring in clinical areas
  • Acoustic ceiling tile and drywall ceilings throughout
Mechanical/Electrical
  • Mechanical and electrical equipment installation
  • Plumbing
  • Piping and duct work
  • Heating and cooling, piping and installation
  • Air handling equipment

  Construction Hotline
416-305-1663
  Click to E-mail Us

Construction Hotline
416 305 1663
Click to Email Us

Latest News
Read the January 2012 issue of our redevelopment community newsletter
16/01/2012
The January 2012 issue of our redevelopment community newsletter, Changing the Landscape, is now available.
Map of construction truck routes
26/04/2010
View a map of the routes that construction trucks will take.
View our live webcams!
22/01/2010
Take a peek inside our construction site through our three webcams.