Here are some 'fast facts' on the new hospital building:
| Building Area: |
Approx. 680,000 ft² (464 beds) |
| Concrete structure: |
36,500 m3 of concrete 1,300,000 ft2 of form work |
| Structural steel: |
225 metric tonnes |
| Hospital Equipment: |
16,000 pieces to relocate or purchase |
Leadership in Energy & Environmental Design (LEED) Goal:
|
Certified |
Site Work
- Physical changes to the property and land
- Phased site servicing and temporary parking lots
- Bulk excavation, lagging, and tie-backs
- Parking lot preparation
- Extensive landscaping plans
Structural
- Piles and caissons for concrete structure
- Multi-level cast in place concrete structure
- Structural steel penthouse
Envelope
- Fabrication and installation of curtainwall
- Exterior finishes such as stone veneer, aluminum, glazing, curtainwall, wood, stone, cementitious panel soffits
- Green roof
Finishes
- Drywall and masonry partitions throughout, with wall protection in high traffic areas
- Concourse and ground levels to have terrazzo flooring and cementitious wall paneling in public corridors with wood slat ceilings to be consistent with soffits at ground level
- Terrazzo flooring in public spaces, linoleum/vinyl/fluid applied flooring in clinical areas
- Acoustic ceiling tile and drywall ceilings throughout
Mechanical/Electrical
- Mechanical and electrical equipment installation
- Plumbing
- Piping and duct work
- Heating and cooling, piping and installation
- Air handling equipment
|